Corrugated Pipe Processing and Installation

Jul. 28, 2020

Layering the corrugated pipes according to the design paper and fasten them,  the channel should be smooth and without any angle. All the joint length of the  pipe should obey the principle of the 5d, then use a bigger size corrugated pipe  socket, symmetric tighten and protect the joint of the pipe in case of the  mud.

Under the construction, the personnel, machinery, vibration rods couldn’t  male collision with the pipeline.

The pipes should be checked carefully before pouring concrete carefully. We  should mainly check whether there are holes on the channels, the joint is fasten  well, the position of the channel is right or not. After checked carefully, then  adopt the method of ventilation air compressor to ensure the pipe’s clear.


Other Blog

  • Highway ConstructionHighway Construction
  • Mine ProjectionMine Projection
  • Municipal EngineeringMunicipal Engineering
  • Irrigation EngineeringIrrigation Engineering
  • Railway Construction ProjectionRailway Construction Projection
  • Other ApplicationOther Application

Do you need a project solution?

With first-class products and services, and make greater contributions

WeChat
WeChat