Corrugated metal culvert, Corrugated metal pipe,Corrugated metal Pipe culvert manufacturers China
Home About Us Product Catalog News & Tech-info R & D and design Project Download Contact Us

Products Catalog

Corrugation 68mm x 13mm

Corrugation 76mm x 25mm

Corrugation 150mm x 50mm

Corrugation 200mm x 55mm

Corrugation 300mm x 110mm

Corrugation 380mm x 140mm

Corrugation 400mm x 150mm

Corrugation 68mm x 13mm

Corrugation 75mm x 25mm

Corrugation 125mm x 25mm

Contact Us

Corrugated Pipe Processing and Installation

Layering the corrugated pipes according to the design paper and fasten them,  the channel should be smooth and without any angle. All the joint length of the  pipe should obey the principle of the 5d, then use a bigger size corrugated pipe  socket, symmetric tighten and protect the joint of the pipe in case of the  mud.

Under the construction, the personnel, machinery, vibration rods couldn’t  male collision with the pipeline.

The pipes should be checked carefully before pouring concrete carefully. We  should mainly check whether there are holes on the channels, the joint is fasten  well, the position of the channel is right or not. After checked carefully, then  adopt the method of ventilation air compressor to ensure the pipe’s clear.


Corrugated metal culvert, Corrugated metal pipe,Corrugated metal Pipe culvert manufacturers China
Address: Hegang Road, Wuyi Circle Economic Zong, Hengshui City, Hebei Province, China
Tel: + 86 318 5876 109
Fax: +86 318 5876 111

Mobile: +86 186 0318 8333

Copyrights © Hengshui Yitong Pipe Industry Co.,Ltd. All Rights Reserved

Powered by

Sitemap
Home   |  About Us   |  Product Catalog   |  News & Tech-info   |  R & D and design   |  Project   |  Contact Us