Steel corrugated arch save cost than beam bridge

Steel corrugated arch save cost than beam bridge

The expressway overpass adopts a 3-span simply supported beam bridge to achieve the crossing of the expressway, with two side spans achieving slope brushing function.

The expressway overpass adopts a 3-span simply supported beam bridge to achieve the crossing of the expressway, with two side spans achieving slope brushing function. Therefore, it is necessary to construct a 3-span supported beam bridge, as shown in the picture 1. Optimize another solution, as shown in the picture 2, such as using a buried corrugated steel arch bridge with two spans of 20 meters to achieve project construction and engineering goals, and significantly save time and costs.


Steel corrugated arch save cost than beam bridge


Steel corrugated arch save cost than beam bridge

Special Customization

The function, size, and appearance can be based on different application scenarios and industries

Provide OEM/ODM services,support field conditions investigation, etc


Steel plate thickness: 1.6mm-10mm,

Span: 300mm-25m,

Waveform: 68X13mm, 147X47mm, 152X51mm, 200X55mm, 381X140mm

Do you need a project solution?

With first-class products and services, and make greater contributions

WeChat
WeChat